Ademix 711 Epoxy Primer

Construction Chemicals​

Floor Applications​

Ademix 711 Epoxy Primer

Epoxy Based Floor Coating Primer

Epoxy Based Floor Coating Primer

Epoxy Based, Double Component, Low Viscosity, Solvent-Free Floor Coating Primer.

It is used as a primer for all epoxy and polyurethane floor coverings on normal and extremely absorbent surfaces in priming concrete surfaces, cement screeds, and epoxy mortars.

It can also be used as filling and surface smoothing mortar by mixing with quartz sand.

It is easy to apply.

It is solvent-free.

It has high adhesive power.

It has good penetration property.

It can also be used outdoors.

It is impermeable, seals the gaps and pores.

It is resistant to abrasion after curing.

It has low viscosity.

Epoxy Resin – Transparent Liquid
Epoxy Hardener – Transparent Liquid 

13,57 kg 

6,43 kg 

Component A: ~ 1,10 kg/lt

Component B: ~ 1,05 kg/lt

Mixture: ~ 1,10 kg/lt

Mortar): ~ 85 N/mm² (28 days / +23°C / 50% relative humidity)  

Mortar): ~ 25 N/mm² (28 days / +23°C / 50% relative humidity)  

 > 2 N/mm² 

: ~ 80 (7 days / +23°C / 50% relative humidity)  

*The above values were obtained as a result of laboratory experiments.

 

 +10°C minimum / +30°C maximum 

+10°C minimum / +30°C maximum 

Humidity ratio <4% by weight 

 ~ 7 days 

80% maximum 

+10°C ~ 60 minutes

+20°C ~ 30 minutes

+30°C ~ 15 minutes

*These values are valid for 23°C and 50% relative humidity. Times may vary depending on ambient conditions.

The concrete surface should be clean, strong and should have sufficient compressive strength (minimum 25 N/mm²).

The surface should be clean, dry and free from foreign substances such as dirt, oil, coating, surface curing materials.

If necessary, the surface layer should be cleaned with equipment like blast rock. The dusty surface created in the environment should be swept. 

Component B of ADEMIX 711 EPOXY PRIMER should be added into component A and stirred with an aid of 300-400 rpm for 3 minutes until a homogeneous mixture is obtained. 

To make sure that the mixture is made completely, the mixture is put in another container and stirred again for another 1 minute.

After the mixture is prepared, if quartz sand is required, it should be stirred for another 2 minutes until a homogeneous mixture is obtained.

Over stirring should be avoided to minimize air entrainment.

For the preparation of mortars, a coiler can, paddle or flat type mixer should be used. Concrete type (free-fall) mixers should not be used.

ADEMIX 711 EPOXY PRIMER is applied to the floor with the help of an unused comb or roller. During the application, care should be taken to propagate the material homogeneously on the previously prepared surface. Irregularities on the surface cause the formation of capillary active gaps and bubble formation after curing the material. A second layer can be applied to make sure the gaps are fully closed. 

Leveling mortar is applied with a notched trowel or rake according to the desired thickness. Rough surfaces need to be levelled first. 

It is applied with a roller, brush or rake.

Sand added mortar is propagated on the adherence bridge which is still sticky, by using leveling laths and within a short time, the surface is smoothed by compressing, using a trowel or teflon coated finishing machine (20-90 rpm).ADEMIX 711 EPOXY PRIMER For the best results in its application, ambient temperature should be in between +10°C and +30°C 

and necessary measures should be taken in bad weather conditions.

-Processability and curing times vary according to the ambient temperature. The times are shorter at high temperatures, and longer at low temperatures.

-The application area should be protected from heavy weather conditions for 24 hours after the application. (sun, wind, frost, rain, etc.)

– The pre-stored packages to be opened for application should be ready for use at an average of 25°C.

-After the application is completed, the coating should not be exposed to water directly for at least 24 hours.

-Used tools and equipment should be cleaned with cellulosic thinner or suitable solvent after application. 

– In places where humidity is high,ADEMIX 711 EPOXY PRIMER should not be used. 

-In order to ensure proper aggregate size distribution, trials should be made for epoxy mortar mixtures.

The above values are theoretical. They do not include the need for additional materials depending on the surface and application.

All necessary Occupational Health and Safety measures must be taken in the application areas. All work safety equipment, such as work clothes, protective gloves/goggles /mask, should be used during the application in accordance with the Occupational Health and Safety rules. Ventilation of the working area is required. Warehouse and stock areas should not be approached with fire. Contact of the product with the skin and eyes should be prevented, in such a case, the contacted part of the skin should be washed with plenty of water and medical attention is required immediately. Food and beverages should also not come into contact with the product. It should be kept out of reach of children.

Epoxy Resin – Transparent Liquid
Epoxy Hardener – Transparent Liquid 

20 kg set

Epoxy Resin (Component A): 13.57 kg tin can

Epoxy Hardener (Component B): 6.43 kg tin can

  It should be stored in its original package in a dry environment, protecting from frost. 

If appropriate storage conditions are provided, it is 18 months from the production date.