Sorularınız mı var?
(+90) 486 534 20 73
Sorularınız mı var?
(+90) 486 534 20 73
Ademix

Ademix 701 RS

Construction Chemicals​

Floor Applications​

Ademix 701 RS

Ready Screed

Ademix 701 RS

Ready Screed

Description:

Cement Based Ready Screed 

Areas of Use:

It is used to obtain a smooth surface in indoor and outdoor floors. 

Advantages:

Saves time and labor.

It has high adherence. 

Thanks to its partial fluidity, it is easily gauged.

It is suitable for intensive use areas.

It is not a topcoat material. It prepares the ground for the topcoat flooring.

Technical Specifications:
Flexural Strength: ≥ 5 N/mm²
Compression Strength: ≥ 20 N/mm² 

Max. Grain Size: 3 mm 

*The above values are valid for 28 days of performance that was obtained as a result of laboratory experiments.

Application Information:

Application Temperature: (+5°C) – (+35°C)
 Mixing Ratio: 3 – 4 lt water / 25 kg powder
Usable Time: 1 hour

Application Thickness: 5-20 mm

Average Consumption: 1,5-2 kg/m² (for 1 mm thickness)

*These values are valid for 23°C and 50% relative humidity. Times may vary depending on ambient conditions.

Surface Preparation:

­ -The application surface should be made clean from dust, dirt, oil, paint residue, and similar foreign matters reducing adherence.

-The surface should be moistened with water before the application.

Mixture Preparation:

25 kg ADEMIX 701 RS is slowly added to 3 -4 lt water. It is stirred until a homogeneous mixture is obtained with a low-speed mixer, leaving no lumps. The prepared mortar should be rested for 5 minutes.

Application:

The prepared mixture is applied on the surface with a trowel in uniform thickness. It is propagated with a wide and long spatula and straightened with a gauge.

Surfaces, where ADEMIX 701 RS is applied, must be moistened within 12-24 hours. The second humidification should be done 24 hours after the first humidification. The surface should be moistened for 2-3 days. Further irrigation increases material performance.

– It is convenient to walk on the applied floor after 12 hours.Full hardening takes place after 24 hours.

-Applications should not be carried out in temperatures below 5°C.

– Without taking protective measures, applications should not be made on surfaces that are exposed to sun and wind, directly.

-Foreign materials should never be mixed into the mortar.

-After application, all used tools should be washed with plenty of water before drying.

Warnings: 

Do not inhale the product directly, as it is cement-based. Avoid contact with skin and eyes.

Reference Standard:

TS EN 13813 

CT-C20- F5 

Color: Grey
Package:25 kg kraft bag 

Shelf life: 12 months in the dry environment and original package.